Home > GoldEx > History
History

2015 A hot potcasting production line is added and put into production;a 2000T

doubleactionreverse extrusionproduction line is added andplanned to beputinto

production by the end of 2015

———————————————————————————————————————————————

2014 A 1250T double-action reverse extrusion production line was addedand put nto

production.

———————————————————————————————————————————————

2013 Acquired eight patents for utility models; independently researchedanddeveloped

new JL- 30 aluminum alloy materials; metal processing workshopwasbuilt and

put into production

———————————————————————————————————————————————

2012 Inteoducing 16T Billet-casting workshop

———————————————————————————————————————————————

2011 Plant construction was completed and put into production

———————————————————————————————————————————————

2010 Guangdong GoldEx Light Alloy Co.,Ltd. was established

甘肃快三 江苏福彩 甘肃快3 甘肃快3 甘肃快三 江苏福彩 江苏福彩 甘肃快3 江苏福彩 甘肃快三